ALL
INDIA POSTAL EMPLOYEES UNION GROUP ‘C’
CHQ: Dada Ghosh Bhawan, 2151/1, New Patel Road,
New Delhi - 110008
Ref: P/4-5/PLI Dated - 06.10.2014
To
The Secretary
Department of Posts
Dak Bhawan, New Delhi – 110001
Sir,
Sub: - Problems
arising out in Core Insurance solution/Mc Camish migration – Request for
solutions – Reg.
The following are the problems faced by officials working in
the McCamish software in PLI/RPLI migration that require to be addressed early
to ensure prompt and hassle-free migration:
1] No proper training or clear cut instructions
were given to the officials working in McCamish software resulting in lot of
practical difficulties.
2] Likewise, for the areas of KLC Updating and UA
settlements, no proper guidance or instructions were given.
3] The frequent Startup problems with invalid
configuration that lead to failure in forms server or failure to connect to
server create untold miseries in carrying out the migration work.
4] The files that could not be corrected in the
DATA CORRECTION at the end of the designated offices had to be sent to
respective D.O/R.O or even C.O. for carrying out at C.O. It is
pertinent to note that certain files could not be opened at designated
HO/offices level and are blocked. Hence, they have to be opened and
operated at R.O/C.O. only. Consequent to this the Date Correction
work remains incomplete.
5] All the relevant documents are not available at
offices for Loan Ledger Updation and hence the files have to be sent to R.O.
for further action in this regard. Especially, the policies that come
across the counter for Repayment/Interest on loan create discrepancies relate
to loan ledger under different rules as RULE 38B, 39B, 44B,45B, 47B,
48B,35B;36B,23B,23F,341B, 25B, 339F,335B,329B,55B etc
Further, it is intimated that the date of payment of loan could
not be ascertained from the PLI files.
6] As far KLC Updation is concerned, it is
intimated that correct premium payment date by the policy holders is not
known.
7] As the rule discrepancy entries are blocked,
the same could not be completed at the offices/Hos. Likewise, the
RPLI module too found locked and cannot be altered at the designated offices.
8] Special PAO codes are not available at
designated offices, hence, the discrepancy regarding KLC gaps and entering
missing years in KLC updation cannot be done there. Oral instructions
are being issued every now and then not to do the same at HO level but so far
no written communication/mail have been received.
9] It
is instructed that the Ledger posting should not be updated with N [no] for the
past, but it is pertinent to point out that the manual schedules for the past
period are not available at the HO end that result in impasse in updating the
ledger files. Without verifying proper manual records, filling up with
Y[yes] as per the written instructions may boomerang on staff in the
future. The updation cannot be done on assumptions and false
presumptions. This area needs to be addressed properly without
insisting on simple filling with ‘Y’ only.
10] Even
for Maturity and Surrender details of payment not updated in NIC
software. As the files are not available at the HOs, the payments
could not be checked by verifying the available records.
11] For E category and to some extent B category rules, only excel
format are being used and not fed in NIC software as the columns are
blocked. Hence, the accuracy factor is in question
12] For missing years in KLC in PAO codes for special groups like
Railways, Schools, Govt. establishments having bulk policies, PANO codes could
not be done owing to non availability of payment schedules.
13] ‘Converting of policies’ during data cleansing: No such
conversion available with checked files.
14] While Date Cleansing, the difference is sum assured and premium
amount with files and NIC software have to be sent to CO through respective DO
for corrections .But, those files are generally returned without any
correction.
15] For
updation of AEA payment, no particulars available in the Case files received.
16] Assignment
and reassignment of records could not be done at HOs but only at D.O. level
only.
17] Several
policies with PAO code as per the schedules are in migrated
level. For such policies the premium cannot be updated as the
details cannot be viewed and altered.
These are only some of the problems in the migration
process. It is further added that many technical issues needs to be
resolved by the only System manager attached at R.O. as the S.Ms of
divisions and HOs are also not equipped with trouble-shooting. This
aggravates the problem further.
Without taking into account all these discrepancies and expecting
the officials to complete the work as ‘he horses for the courses’ way may
become counter-productive. “During migration, E category rules will not be
checked by Infosys and if any wrong data will be there, it will be migrated as
it is and post migration there is no provision to correct/update any of the
data” is like shifting all the burden on the slender shoulders of the poor
officials without creating a conducive atmosphere for proper migration which is
trouble-free. Hence, it is requested that all these technical issues
are properly addressed at the earliest and then the migration done to avoid any
major head-ache in the future. All technological and practical impediments may
please be sorted out and user friendly environment be ensured for effective,
smooth and best service to the clients.
Soliciting early response and awaiting a quote in reply.
With warm regards,
Yours faithfully,
(N. Subramanian)
General Secretary
No comments:
Post a Comment